Renewable curtailment: who pays when a wind or solar farm stops?
Open the documentsThe source documents
The documents cited in the analysis and, where identified, their associated passages. An automatically detected association is not a verified claim.
Consult the references in the article below. No document has been identified for this shortcut.

Sources and reading context
Topics
Contents6 sections
A solar farm can have all the sunlight it needs at noon and still cut output. If the line carrying its electricity away is full, the grid operator can limit how much the farm puts onto the system. If the wholesale price falls below zero, the operator of the farm may decide that selling another megawatt-hour would cost it money. Either way, the meter records less generation than the site could have delivered. Finding out who bears the cost starts with who called for the cut and under which contract. S01 · S02 · S04
Two reasons to cut output
Renewable curtailment means reducing generation below the available output. In the International Energy Agency (IEA) definition of technical curtailment, a grid operator instructs a plant to cut generation to manage a network or system constraint. A line out of a particular area can fill up even when the national wholesale price is positive. Equally, a negative price can make some farms choose to stop while they still have room to deliver power. S01 · S02 · S04
Across the key markets it studies, the IEA estimates that technical curtailment of wind and solar reached nearly 200 TWh in 2025. Its main case puts the figure above 800 TWh in 2031, equivalent to nearly 8% of total variable renewable generation, according to the IEA. That projection incorporates assumptions about both the rollout of renewables and the system’s capacity to integrate them. S01
France’s transmission operator RTE tracks a different measure for mainland France. Its flexibility report estimates that wind and solar farms cut output by 0.5 TWh in 2023, 1.7 TWh in 2024 and about 3 TWh in 2025 during periods of negative wholesale prices. In its annual review, RTE separately reports around 0.1 TWh in 2025 from its requests to reduce output for system balancing. That figure covers a specific set of instructions. S02 · S03
Negative prices spread through the day
French day-ahead electricity averaged €61/MWh in 2025. In the same year, RTE recorded 513 hours of negative prices, up from 352 in 2024. After the market moved to fifteen-minute trading intervals in October 2025, an hour is classified from the average of its four intervals. A farm selling into the wholesale market earns the price for its delivery interval. RTE links the midday dip to lower demand at those hours and more solar generation in France and its neighbours. S04
The trend continued in 2026. RTE estimates that wind and solar farms cut 2.5 TWh in the first half during negative-price periods, compared with 1.9 TWh in the first half of 2025. By 8 October 2026, France’s energy regulator CRE had counted 568 hours of negative day-ahead prices, more than in the whole of 2025. That count measures time on the wholesale market. The amount of energy curtailed also depends on wind and sunlight and on the contracts that govern the operating farms. S05 · S06
The contract determines who pays first
A farm selling directly to the market can avoid a cost by stopping when the price goes negative. A long-term power purchase agreement changes the calculation. CRE found contract terms that allow buyers to request a shutdown, compensate the producer and buy cheaper electricity on the market. The agreed price for delivery and the payment due if generation stops are separate clauses. S04 · S07
Some French market-premium contracts allow a payment for stopping in negative-price periods beyond a threshold and subject to the scheme’s conditions. Eligible support costs are funded through the state budget. EU law separately requires compensation from the grid operator requesting non-market redispatch, with an exception for producers that agreed to a connection without guaranteed firm delivery. Different events trigger those payments and different parties owe them. S04 · S08 · S09
Choosing between a battery and a power line
A battery can charge when electricity is plentiful and supply it later, with conversion losses and limits on its power, capacity and state of charge. Where it sits determines the service it provides. On the side where generation backs up, charging can temporarily reduce flows through a congested line. Flexible demand can also absorb some of the surplus in that area. Reinforcing the grid may address a more persistent constraint. Comparing the options means looking at the hours each one covers and its cost over time. S01 · S03 · S10 · S11
France’s regulator already sets a framework for RTE to make this trade-off. Occasional output cuts, with compensation where applicable, can defer or avoid some grid upgrades. The case depends on how often and for how long the network is constrained, the value of the power withheld and the cost of the proposed upgrade. Storage, new lines and occasional cuts serve different needs over the course of a year. On the demand side, the French Tempo tariff offers a familiar example of how a varying price can encourage customers to shift usage. S03 · S10
Limits of a financial estimate
Pricing an output cut requires its timing, the applicable sale price, available generation and the compensation terms. A grid constraint also calls for its location and the cost of relieving it another way. Applying the annual average of €61/MWh to curtailed energy mixes hours and overlooks contracts. Public support, forgone revenue and avoided grid expenditure belong in separate calculations. A useful comparison starts with the specific farm and network line, using the rules that applied when output was cut. S04 · S07 · S10
For more on the physical limits of generation, read The Wet Megawatt. The opening image is a digitally generated editorial illustration.
Sources
- Renewables 2026, system integration
Passages and scope
Executive summary, discussion of technical curtailment and flexibility. The full report, pp. 67–68, describes coverage and assumptions. Estimate for 2025 and main case for 2031.
- 2025 Electricity Review, generation
Passages and scope
Wind and solar output modulation section. Estimates during negative spot prices and a separate measure of adjustments requested by RTE. Date of the full report.
- Electricity demand flexibility review
Passages and scope
Table on p. 10 and discussion on p. 33, annual estimates of output cuts during negative-price periods. Other sections cover flexible demand.
- 2025 Electricity Review, wholesale prices
Passages and scope
Spot prices, the hourly curve and negative prices. French average, negative-price hours, quarter-hour convention and incentives in certain contracts. Date of the full report.
- First-half 2026 Electricity Review
Passages and scope
Pages 5 and 49, §7.2. Output cuts during negative spot prices in the first half, with a comparison to the same period in 2025.
- Negative prices in wholesale electricity markets
Passages and scope
Summary and §1 of the linked report. Count as of 8 October 2026, using the average day-ahead price for each hour. Counts hours with a negative average.
- Review of long-term power purchase agreements
Passages and scope
§3.2.3, p. 40 of the PDF. Survey responses on shutdown clauses and compensation during negative prices. Terms vary from one deal to another.
- Funding public-service energy costs in France
Passages and scope
State-budget funding arrangements for eligible public-service costs. Scope covers public support generally.
- Regulation (EU) 2019/943, Article 13
Passages and scope
Article 13(7), compensation for non-market redispatch and the exception for connections without guaranteed firm delivery. Official Journal publication date.
- Transmission tariff and efficient grid sizing
Passages and scope
Pages 42–43 and §2.7.3.1–4. French framework for local flexibility and efficient sizing of the transmission network. Costs depend on project and location.
- Connecting stationary batteries to the grid
Passages and scope
Network development plan, fact sheet 8. Location and flow direction determine whether a battery relieves or adds to the local constraint.
This analysis is not investment advice.